Installation and start-up of a workshop CIP sink
An automated CIP workshop mini-washer was installed at the operating enterprise. The washing machine is integrated into the line of the dairy shop by software.
As a result, the goal was achieved:
- The time of preparation of solutions has been reduced;
- The length of pipelines for the supply and return of cleaning solutions has been reduced. The cost of fittings and installation time;
- Archiving of the washing process (recording of the consumption of water, detergents, steam)