Installation and start-up of a steam generator of 1500 kg of steam per hour
Reconstruction of the boiler room of the current enterprise:
Replacement of the old gas boiler with a modern steam generator of higher productivity with waste gas heat recovery. In addition to the steam generator, 2 burners are supplied: gas and diesel.
As a result, the goal was achieved:
- Boiler start-up time was reduced;
- Economic efficiency was 16-17 thousand UAH/month;
- Possibility to reconfigure to different energy supply