Installation and start-up of a steam generator of 1500 kg of steam per hour

Reconstruction of the boiler room of the current enterprise:

Replacement of the old gas boiler with a modern steam generator of higher productivity with waste gas heat recovery. In addition to the steam generator, 2 burners are supplied: gas and diesel.

As a result, the goal was achieved:

  1. Boiler start-up time was reduced;
  2. Economic efficiency was 16-17 thousand UAH/month;
  3. Possibility to reconfigure to different energy supply